This indicator measures the percentage of scheduled miles operated by the Tyne and Wear Metro. It is produced for 4 week periods.
Since April 2017 Metro Operations have been handed back from DBTW, the concessionaire, to Nexus.
This indicator measures the percentage of scheduled miles operated by the Tyne and Wear Metro. It is produced for 4 week periods.
Since April 2017 Metro Operations have been handed back from DBTW, the concessionaire, to Nexus.